2022 ExxonMobil Huizhou Ethylene Phase I Project Start Ceremony
Release time:
2022-11-04
2022 ExxonMobil Huizhou Ethylene Phase I Project Start Ceremony
Hanyang Heavy Industries
On October 31, 2022, Hanyang Heavy Industry Equipment Manufacturing (Tianjin) Co., Ltd. (hereinafter referred to as Hanyang Heavy Industry) undertook the ethylene rectification tower and pre-demethanizer of the ethylene plant of ExxonMobil Huizhou Ethylene Phase I Project in Tianjin Binhai New Area The port of Lingang Industrial Zone was successfully shipped.

The maximum diameter of ethylene distillation tower in this transportation is 6m and the maximum length is 90m;
The main material is S30408, and the ship is loaded by ro-ro;
Pre-demethanizer, with a total length of 72m and a maximum wall thickness of 96mm;
The main material is S30408, which is loaded on the ship by ro-ro.
Shipment from Tianjin Port to sea, travel south to Mobil Huizhou Petrochemical Base, delivered to the owner.



Next Page
Related News
2022-09-13
Contact Us
Telephone (Tel):+86-22-88712757
Zip code (Zipcode):300353
E-mail (E-mail):hanyangjs@163.com
Address: No.18 Ningyuan Road, Huangtai Industrial Park, Xiaozhan, Tianjin