SEI Zhongsha (Tianjin) Polycarbonate Project Pre-inspection Meeting Successfully Held in Our Company
Release time:
2019-07-09
On July 5, a pre-inspection meeting for SEI Zhongsha (Tianjin) 260000 Tons/Year Polycarbonate Project (hereinafter referred to as Zhongsha Project) was held in Tianjin Hanyang Metal Equipment Co., Ltd. (hereinafter referred to as Tianjin Hanyang).
The Zhongsha project is located on the south side of the olefin department of Sinopec Tianjin Branch, covering an area of 66.6 hectares with a total investment of 11.027 billion billion yuan, including two production lines with a total of 8 sets of production units.
According to the meeting process of the pre-inspection meeting, the participants shall confirm the organization of the supplier of the manufacturer, clarify the contact channel with the supplier on the inspection work, confirm the technical, quality requirements and use standards of the purchase requisition documents and orders, and confirm that all documents received by the supplier are the latest version and other requirements are discussed and studied. Through this pre-inspection meeting, a solid foundation has been laid for the smooth progress of the future work of the Zhongsha Project.



Related News
2022-09-13
Contact Us
Telephone (Tel):+86-22-88712757
Zip code (Zipcode):300353
E-mail (E-mail):hanyangjs@163.com
Address: No.18 Ningyuan Road, Huangtai Industrial Park, Xiaozhan, Tianjin