Hainan Refining and Chemical Integration Project Three Large Equipment Successfully Delivered


Release time:

2021-09-07

On September 7, 2021, Hanyang Heavy Industry Equipment Manufacturing (Tianjin) Co., Ltd. (hereinafter referred to as Hanyang Heavy Industry) undertook the Hainan Refining Integration Project ethylene plant demethanizer and pre-demethanizer, The carbon triple scrubber was successfully shipped at Tianjin Port Terminal.

The demethanizer, pre-demethanizer and carbon triple scrubber transported this time are important equipment in the ethylene plant of Hainan Refinery 1 million tons/year ethylene and EPC project of oil refining renovation and expansion project. The demethanizer has a maximum diameter of 3.9 meters, a maximum length of 60 meters and a maximum thickness of 60mm. The main material is S30408, and the transportation weight is about 318 tons. The pre-demethanizer has a maximum diameter of 5 meters and a maximum length of 60 meters, the maximum thickness is 74mm, the main material is S30408, and the transportation weight is about 461 tons. The carbon triple scrubber has a maximum diameter of 3.2 meters, a maximum length of 39 meters and a maximum thickness of 56mm. The main material is S30408, and the transportation weight is about 120 tons. Shipment from Tianjin Port to Hainan Refining and Chemical Integration Project site and delivery to the owner.

Through the manufacture of large-scale towers in the Hainan project, it not only reflects the manufacturing capabilities of Hanyang Heavy Industries, but also fully demonstrates the entrepreneurial spirit of innovation, hard work, unity and cooperation, and fine dedication of Hanyang Heavy Industries. We are confident that we will achieve better results in subsequent projects.

 

 

 

 

 

 

 

 

 

 

 

 

Copyright©2023 Hanyang Heavy Industry Equipment Manufacturing (Tianjin) Co., Ltd.

Powered by 300.cn |Label

Business License